📄 Digital book in PDF · read it on your phone or print it
Pre-start checks, the exclusion zone, hand signals, trenching and benching, buried services, overhead lines, truck loading, levels and shutdown. All in metric, checked against the Australian codes of practice. Each topic has its own page: the drawing first, then what you need to remember. 64 illustrated pages.
🔒 Secure checkout · PDF by email · 30-day guarantee
Each page has one big drawing and a box with the distances, rules and steps you need to know:








Swipe to see more →
These are real pages from the book. The table of contents is the full one: 8 parts and 60 topics.
You're in the seat with the bucket half full and the supervisor watching from the trench edge. The spotter holds out a flat hand, then makes a circle you don't recognise. Is that slow, or swing?
Someone showed you the signals once, on your first day, with the engine running. The induction pack describes them in paragraphs: arm out, palm down, moved side to side. Words don't show you what a moving hand looks like from the cab.

In this book the hand signals get one page. Each signal is a big drawn figure: stop, emergency stop, raise, lower, swing, forward, back and slow, side by side, as you see them from the seat.
The rest of the job works the same way. The exclusion zone from above, the 1.5 metre rule, reading an asset plan, overhead line no-go zones and loading a truck each have their own page.
You look once, you know what the spotter wants, and you keep working. You don't have to dig the induction folder out of the ute.

Before you climb on, pre-start and start-up, exclusion zone and spotters, digging and trenching, buried services, overhead lines and other hazards, loader, skid steer, dozer and truck loading, and levels and shutdown: 64 pages, all illustrated.
Think of it this way:
It's 6.30 in the morning. The plans show a gas main along the boundary, and you're about to put the bucket in the ground with the supervisor watching.
You open the buried services page and see the potholing drawn step by step: the locator marks, the hand-dug hole, the service exposed, and then where the bucket is allowed to go.

The walk-around, the exclusion zone, benching a trench wall, loading a truck and checking depth off the laser work the same way: each one has its own page.
Excavator & Earthmoving Illustrated has 8 parts and 60 topics, all drawn. It finishes with the common mistakes, the stop-work triggers and the whole job on one page.
What you see drawn, you don't have to memorize.
Climb on any machine knowing what you're looking at: the four steps on every page, your duty on site in plain English, reading a SWMS, the parts of an excavator, zero swing versus conventional, and why controls change between machines.
The walk-around in one loop, fluids, tracks and sag, hoses, pins and grease points, coupling and testing a quick hitch, climbing on and start-up checks in the seat.
The exclusion zone from above, blind spots around the cab, approaching a working machine, spotters, the core hand signals, radios and keeping plant, trucks and people apart.
Reading the soil, the 1.5 metre rule, battering, benching, shoring and shields, where the spoil goes, a clean digging sequence, getting in and out, and open trenches overnight.
Know where the bucket can go before it touches the ground: plans before you dig, reading an asset plan, locators and paint marks, potholing, digging beside a live service, warning tape and what to do if you strike one.
Overhead line no-go zones, spotters and height limiters, what to do if the machine touches a line, slopes and soft ground, lifting with an excavator, and dust, silica, noise and heat.
Where the truck sits, even loads and legal mass, bench loading, the loader V pattern, skid steers on slopes and their attachments, the dozer blade, ripper and trimming, and backfill layers.
The laser level and staff, falls in plain numbers, checking depth as you dig, shutdown and post-op checks, defect reports, common mistakes, stop-work triggers and the whole job on one page.
At the end of the book: Common site mistakes, stop-work triggers and the whole job on one page.

Practise the calls you make on site — where people stand, batter or bench, when to stop and hand dig — on simple drawn site plans, with the answer explained on the next page.

The pre-start, exclusion zone, services and shutdown steps on printable cards, so you can go over them in the ute before you climb on.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
PDF by email: We email you Excavator & Earthmoving Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.
You already know the site. Before your excavator course or a VOC, go over the machine side one page at a time, from the walk-around to loading a truck.
Go over the pre-start, the exclusion zone and the trench rules before your first day back, always in the same order.
Hand your new operator the same drawn pages you'd explain on site, so everyone works the job the same way.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
Try Excavator & Earthmoving Illustrated for 30 days, bonus books included.
We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.
You pay once. No subscriptions.
Yes. There's one topic per page, so you can go straight to the exclusion zone, benching or the laser level without reading it cover to cover.
It's checked against the Safe Work Australia model Codes of Practice for excavation work, plant and construction work, the model WHS Regulations, state regulator guidance on overhead lines and plant, and AS/NZS 3500 for drainage falls. Everything is in metric: metres, millimetres and tonnes. Some distances vary by state, so always check your state's current version.
No. It's an independent illustrated guide. It isn't issued, approved or endorsed by Safe Work Australia, any state regulator or any machine manufacturer, and it doesn't give you a ticket, a statement of attainment or a VOC. It helps you understand and go over the job you're assessed on.
No. It doesn't replace your site induction, supervised training, your SWMS or the manufacturer's manual. It has no brands: controls, joystick patterns and quick hitches are explained in general, so it works whatever machine you run. For your machine's controls, hitch and limits, always follow the manufacturer's manual.
No. The 40 scenarios in the bonus workbook were written for this book. They use simple drawn site plans so you can practise the calls you make on site.
The book and the 2 bonus books come as PDFs by email, sent to the address you enter when you pay.
No. It's a one-off payment, not a subscription.
It's a PDF, but you can print it. Print the whole book or just the pages you need and keep them in the ute.
You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.
No more rereading pages that won't stick.
You see the exclusion zone drawn, and that's it.
You climb on knowing where everything is.
Drawings make studying faster.
The book is right below.
One-time payment: US$ 27 · Guarantee: 30 days · PDF by email
YES, I WANT EXCAVATOR & EARTHMOVING ILLUSTRATED FOR US$ 27📄 This is a digital PDF book sent to your email: nothing is printed or shipped.